Homes & smaller jobs
Steel frames for two buildings, Stoke Newington
Box frames and floor steel for two neighbouring buildings, surveyed, made and installed in one programme.
- Location
- Stoke Newington (N16)
- Client
- Landlord and developer
- Steel
- 9.8 tonnes over two buildings
- Main sections
- UC254x254x107, UB254x146
- Our work
- Survey, drawings, fabrication, installation
- Programme
- August to September 2025
Overview
Two neighbouring buildings being reconfigured, each needing new box frames and floor steel. We surveyed both, drew a separate frame for each, and installed them as two phases in August and September 2025.
2 packages on this site
- Building A 2025 · 2.9 tonnes
- Building B 2025 · 6.9 tonnes
Building A
2025 · 2.9 tonnes
Box frames and floor steel at level 2 and roof level, drawn and installed as its own phase.

Building B
2025 · 6.9 tonnes
- Main sections
- UC254x254x107, UB254x146
The larger of the two, with UC254x254x107 frames and UB254 floor beams at level 2 and roof level.

Get a price
Send us your drawings
Email your engineer’s drawings, calculations or a sketch and we’ll come back with a written price.