Large projects

Extension frame and follow-on steel, Royal Buckinghamshire Hospital

A 15 tonne multi-storey braced frame built against a working private hospital, followed by a galvanised plant enclosure.

Location
Aylesbury, Buckinghamshire (HP19)
Client
Main contractor, for a private hospital
Steel
14.95 tonnes, plus a galvanised plant enclosure
Main sections
UC203x203x46, UB305x102x33, flat-bar bracing
Our work
Survey, drawings, fabrication, delivery, installation
Programme
September 2025 to April 2026

Overview

A new multi-storey extension against the existing building of a working private hospital, with basement, ground, first floor and roof steel. After the frame, the hospital came back to us for a galvanised plant enclosure.

2 packages on this site

  1. Extension frame September to October 2025 · 14.95 tonnes
  2. Galvanised plant enclosure March 2026

Extension frame

September to October 2025 · 14.95 tonnes

Main sections
UC203x203x46, UB305x102x33, flat-bar bracing

We surveyed, drew the GA plans and fabricated 14.95 tonnes of frame: UC203 columns, UB305 beams and flat-bar diagonal bracing, fixed to the existing structure with M24 resin anchors to the engineer’s specification.

When ventilation ducts clashed with two beams on site, we re-drilled and adjusted the beam levels there and then, and added an extra beam to carry the external brickwork over a manhole.

Our team installed the frame in October 2025 using boom lifts and a spider crane, working around a live hospital. We also carried out the enabling work on the existing facade needed to fit the new steel.

Galvanised plant enclosure

March 2026

Finish
Hot-dip galvanised

A galvanised frame and access stair for the hospital’s new plant enclosure, fitted against the existing building.