Steel frames for two buildings, Stoke Newington

Box frames and floor steel for two neighbouring buildings, surveyed, made and installed in one programme.

Location
Stoke Newington (N16)
Client
Landlord and developer
Steel
9.8 tonnes over two buildings
Main sections
UC254x254x107, UB254x146
Our work
Survey, drawings, fabrication, installation
Programme
August to September 2025

Overview

Two neighbouring buildings being reconfigured, each needing new box frames and floor steel. We surveyed both, drew a separate frame for each, and installed them as two phases in August and September 2025.

2 packages on this site

  1. Building A 2025 · 2.9 tonnes
  2. Building B 2025 · 6.9 tonnes

Building A

2025 · 2.9 tonnes

Box frames and floor steel at level 2 and roof level, drawn and installed as its own phase.

Building B

2025 · 6.9 tonnes

Main sections
UC254x254x107, UB254x146

The larger of the two, with UC254x254x107 frames and UB254 floor beams at level 2 and roof level.